Make sure the outer edge extends over the gutter.
Roll roofing installation drip edge.
In roofing one square equals 100 square feet.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Step 8 nail the roofing down every 3 inches.
Prepare roof edges cant strips.
Walkthrough of the basic cut for drip edge installation on your roofing project.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
The roofing should overhang the eaves by inch except where you install drip edge flashing on top of the roofing along the rake edge.
If it doesn t pull the drip edge out slightly from under the shingles.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Place the top edge of the roofing along the chalk line.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a distance of 8 feet or so.
Roll out and cut roll roofing to cover the length of the roof.
How to install a drip edge.
An underlayment of felt roofing is optional.
Line up the edge of a sheet of roll roofing with the chalk line and roll the roofing across the entire length of the roof.
The roofing should extend 1 inch beyond the drip edge.
Align the roofing with the chalk line and nail down the edge that runs along the drip edge working out any bubbles as you go.
Once you learn how t.
This will be your first course of roofing.
Drive nails every 3 inches along the rake at one end pull it taut and drive nails along the eave edge.
The outside square cut is the basis for all other cuts.
The nails should be about 1 inch from the edges.
On the rake of a gable roof the drip edge metal goes over the paper as shown in the first drawing in the op link but on the eave the drip edge metal goes on first and then the paper over that.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Secure the drip edge with roofing cement.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
Depends what edge of the roof you are talking about.
The drip edge goes on the wood deck then paper then roofing material.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.